page_banner

China OEM New Building Construction Materials Product – Detailes Of Steel Structure Warehouse – Zhong Bo

Hello, come to consult our products !

China OEM New Building Construction Materials Product – Detailes Of Steel Structure Warehouse – Zhong Bo


Product Detail

Product Tags

Related Video

Feedback (2)

With our leading technology at the same time as our spirit of innovation,mutual cooperation, benefits and growth, we're going to build a prosperous future together with your esteemed firm for Chemical Erode Resistant Property High-Performance Power Coated Steel Structure, Shipping Container House, Steel Structure For Car Parking, We sincerely welcome overseas customers to consult for the long-term cooperation and the mutual development.
China OEM New Building Construction Materials Product – Detailes Of Steel Structure Warehouse – Zhong Bo Detail:

Detailes Of Steel Structure Warehouse

Detailes Of Steel Structure Warehouse

ITEMS

SPECIFICATION

Main Steel Frame Colum Q235,Q355 Welded H Section Steel
Beam Q235,Q355 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee Brace Q235 Angle Steel
Tie Bar Q235 Circular Steel Pipe
Brace Q235 Round Bar
Vertical and Horizontal Support Q235 Angle Steel, Round Bar or Steel Pipe
Maintenance System Roof System Roof Panel (EPS/Fiber Glass Wool/Rock Wool/PU Sandwich Panel or Galvanized Color Steel Sheet ) and Accessories
Window System Aluminum Alloy Window/ PVC Window/Skylight
Door System Sliding Sandwich Panel Door/Rolling Metal Door/PVC Door
Others PVC Rainspout, Gutter etc
Wind Resisitance Grace 12 Grades
Earthquake-resistance 8 Grades
Structure life span Up to 50 years
Temperature Suitable temperature -50℃~+50℃
Certification SGS, ISO9001:2008, ISO 14001:2004
Finishing Options Vast array of colors and textures available
Paint Options Alkyd painting, two primary painting, two finish painting(gray paint, red paint, white paint, epoxy zinc etc.) or Galvanized.

Characteristics

1. Different types and sizes according to customer’s demand: large or small, wide span, single span or multiple spans. The max span is 36m without middle column.
2. Low cost and maintenance advantages.
3. Fast construction and easy installation: time saving and labor saving, all the items are factory-made.
4. Reduced construction waste, long using lifespan: up to 50 years.
5. Nice appearance.
6. Others: environmental protection, green building house, energy saving, stable structure, High quake-proof, water proof and fire proof, and energy conserving.

Derust grade: Ball blasting Sa 2.5 on main steel structure, manual derust St2.0 on secondary steel structure.

Type of building: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.

Design and Processing

Design
Processing

Packing & Delivery and Installation

Installation
Packing & Delivery

Visitors

Visitors
Visitors2
Visitors1
Visitors3


Product detail pictures:


Related Product Guide:

Our firm aims to operating faithfully, serving to all of our consumers , and working in new technology and new machine continually for China OEM New Building Construction Materials Product – Detailes Of Steel Structure Warehouse – Zhong Bo , The product will supply to all over the world, such as: Belgium, Argentina, Tunisia, As an experienced factory we also accept customized order and make it same as your picture or sample specifying specification and customer design packing. The main goal of the company is to live a satisfactory memory to all the customers, and establish a long term win-win business relationship. For more information, please contact us. And It is our great pleasure if you like to have a personally meeting in our office.
The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
5 Stars By Julia from Houston - 2018.10.09 19:07
Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
5 Stars By Aaron from Vietnam - 2018.07.12 12:19
Write your message here and send it to us