page_banner

China OEM Steel Frame Building Cost Manufacturers – Detailes Of Steel Structure Hangar – Zhong Bo

Hello, come to consult our products !

China OEM Steel Frame Building Cost Manufacturers – Detailes Of Steel Structure Hangar – Zhong Bo


Product Detail

Product Tags

Related Video

Feedback (2)

"Based on domestic market and expand abroad business" is our enhancement strategy for Steel Structure Building Prices, Prefabricated Factory Building, Prefabricated Poultry House, We have a big inventory to fulfill our customer's requires and needs.
China OEM Steel Frame Building Cost Manufacturers – Detailes Of Steel Structure Hangar – Zhong Bo Detail:

Detailes Of Steel Structure Hangar

Aircraft hangars are offen refered to as “dedicated garages” for aircraft. They can vary from simple “Masking” structures that protect all or part of the aircraft from elements to complex enviromental control and maintenance facilities in which robots apply radar-absorbing coatings. However, because the aircraft is designed for flight, it is necessary to minimize its maintenance time in the hangar and maximize the availability of flight. The armed force have developed the final design for the hangar facility to accommodate and maintainits aircraft.

Our Service

Fabrication
1. Production job based on steel building drawing designed by our engineer.
2. We also can make the products according to the drawing from customer.
3. Quality control work goes through every step during production.
4. Third Party Quality Check , customer on-site quality inspection and any other  reasonable inspection way, such as BV or SGS.

Derust grade: Ball blasting Sa 2.5 on main steel structure, manual derust St2.0 on secondary steel structure.

Delivery: Usually, if the steel structure quantity are not more than 500 tons, delivery will be within 45-60 days after the order confirmed. It depends on the fabrication quantity.

Installation:

1. After production, we will supply steel building installation drawing.
2. Send techinican to guide installation on site if customer request.

Int’l Trade team: We have six internatioanl trade businessman onlines 24 hours.

Maintenance: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.

Designning and Processing

Design
Processing

Project Show

Project show
3
4


Product detail pictures:


Related Product Guide:

We keep on with our business spirit of "Quality, Performance, Innovation and Integrity". We goal to create much more worth for our customers with our rich resources, state-of-the-art machinery, experienced workers and exceptional providers for China OEM Steel Frame Building Cost Manufacturers – Detailes Of Steel Structure Hangar – Zhong Bo , The product will supply to all over the world, such as: New Orleans, Slovenia, Brazil, Upon today, we have customers from all over the world, including USA, Russia, Spain, Italy, Singapore, Malaysia, Thailand, Poland, Iran and Iraq. The mission of our company is to provide the highest quality products with best price. We are looking forward to doing business with you.
The customer service reprersentative explained very detailed, service attitude is very good, reply is very timely and comprehensive, a happy communication! We hope to have a opportunity to cooperate.
5 Stars By Madge from Philippines - 2017.03.08 14:45
It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
5 Stars By Octavia from Jordan - 2017.07.28 15:46
Write your message here and send it to us