Fabrication
1. Production job based on steel building drawing designed by our engineer.
2. We also can make the products according to the drawing from customer.
3. Quality control work goes through every step during production.
4. Third Party Quality Check , customer on-site quality inspection and any other reasonable inspection way, such as BV or SGS.
Derust grade: Ball blasting Sa 2.5 on main steel structure, manual derust St2.0 on secondary steel structure.
Delivery: Usually, if the steel structure quantity are not more than 500 tons, delivery will be within 45-60 days after the order confirmed. It depends on the fabrication quantity.
Installation:
1. After production, we will supply steel building installation drawing.
2. Send techinican to guide installation on site if customer request.
Int’l Trade team: We have six internatioanl trade businessman onlines 24 hours.
Maintenance: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.