page_banner

Detailes Of Steel Structure Poultry House

Hello, come to consult our products !

Detailes Of Steel Structure Poultry House

1. Different types and sizes according to customer’s demand: large or small, wide span, single span or multiple spans. The max span is 36m without middle column.

2. Low cost and maintenance advantages.

3. Fast construction and easy installation: time saving and labor saving, all the items are factory-made.

4. Reduced construction waste, long using lifespan: up to 50 years.

5. Nice appearance.


Product Detail

Product Tags

Detailes Of Steel Structure Poultry House

Detailes
1

Characteristics

1. Different types and sizes according to customer’s demand: large or small, wide span, single span or multiple spans. The max span is 36m without middle column.
2. Low cost and maintenance advantages.
3. Fast construction and easy installation: time saving and labor saving, all the items are factory-made.
4. Reduced construction waste, long using lifespan: up to 50 years.
5. Nice appearance.
6. Others: environmental protection, green building house, energy saving, stable structure, High quake-proof, water proof and fire proof, and energy conserving.

Our Service

Fabrication
1. Production job based on steel building drawing designed by our engineer.
2. We also can make the products according to the drawing from customer.
3. Quality control work goes through every step during production.
4. Third Party Quality Check , customer on-site quality inspection and any other  reasonable inspection way, such as BV or SGS.

Derust grade: Ball blasting Sa 2.5 on main steel structure, manual derust St2.0 on secondary steel structure.

Type of building: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.

Delivery: Usually, within 45-60 days after the order confirmed. It depends on the fabrication quantity.

Installation:

1. After production, we will supply steel building installation drawing.
2.Send techinican to guide installation on site if customer request.

Int’l Trade team: We have six internatioanl trade businessman onlines 24 hours.

Maintenance: Finish paint need be done after the frame installed, and do it again after 6-8 months.

So the surface will stay more time.

Materials and Packaging, Loading

Materials
Materials1

  • Previous:
  • Next:

  • Write your message here and send it to us