page_banner

China OEM Metal Workshop Product – Detailes Of Steel Structure Poultry House – Zhong Bo

Hello, come to consult our products !

China OEM Metal Workshop Product – Detailes Of Steel Structure Poultry House – Zhong Bo


Product Detail

Product Tags

Related Video

Feedback (2)

All we do is always involved with our tenet " Consumer initial, Trust first, devoting within the food stuff packaging and environmental defense for Steel Structure Two Story Building, Steel Structure For Car Parking, Steel Shed Structure, Adhering to the business philosophy of 'customer first, forge ahead', we sincerely welcome clients from at home and abroad to cooperate with us give you best service!
China OEM Metal Workshop Product – Detailes Of Steel Structure Poultry House – Zhong Bo Detail:

Detailes Of Steel Structure Poultry House

Detailes
1

Characteristics

1. Different types and sizes according to customer’s demand: large or small, wide span, single span or multiple spans. The max span is 36m without middle column.
2. Low cost and maintenance advantages.
3. Fast construction and easy installation: time saving and labor saving, all the items are factory-made.
4. Reduced construction waste, long using lifespan: up to 50 years.
5. Nice appearance.
6. Others: environmental protection, green building house, energy saving, stable structure, High quake-proof, water proof and fire proof, and energy conserving.

Our Service

Fabrication
1. Production job based on steel building drawing designed by our engineer.
2. We also can make the products according to the drawing from customer.
3. Quality control work goes through every step during production.
4. Third Party Quality Check , customer on-site quality inspection and any other  reasonable inspection way, such as BV or SGS.

Derust grade: Ball blasting Sa 2.5 on main steel structure, manual derust St2.0 on secondary steel structure.

Type of building: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.

Delivery: Usually, within 45-60 days after the order confirmed. It depends on the fabrication quantity.

Installation:

1. After production, we will supply steel building installation drawing.
2.Send techinican to guide installation on site if customer request.

Int’l Trade team: We have six internatioanl trade businessman onlines 24 hours.

Maintenance: Finish paint need be done after the frame installed, and do it again after 6-8 months.

So the surface will stay more time.

Materials and Packaging, Loading

Materials
Materials1


Product detail pictures:

China OEM Metal Workshop Product –  Detailes Of Steel Structure Poultry House – Zhong Bo detail pictures

China OEM Metal Workshop Product –  Detailes Of Steel Structure Poultry House – Zhong Bo detail pictures

China OEM Metal Workshop Product –  Detailes Of Steel Structure Poultry House – Zhong Bo detail pictures

China OEM Metal Workshop Product –  Detailes Of Steel Structure Poultry House – Zhong Bo detail pictures


Related Product Guide:

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" as well as the theory of "quality the basic, have confidence in the very first and management the advanced" for China OEM Metal Workshop Product – Detailes Of Steel Structure Poultry House – Zhong Bo , The product will supply to all over the world, such as: Munich, Poland, Georgia, We are very responsible for all details on our customers order no matter on warranty quality, satisfied prices, quick delivery, on time communication, satisfied packing, easy payment terms, best shipment terms, after sales service etc. We provide one-stop service and best reliability to our every customers. We work hard with our customers, colleagues, workers to make a better future.
  • Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
    5 Stars By Darlene from Vietnam - 2017.01.11 17:15
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Alexia from Australia - 2017.06.29 18:55
    Write your message here and send it to us