North China Steel And Building Materials Company – Detailes Of Steel Structure Workshop – Zhong Bo
North China Steel And Building Materials Company – Detailes Of Steel Structure Workshop – Zhong Bo Detail:
Detailes Of Steel Structure Warehouse
Detailes Of Steel Structure Workshop |
|
Main structure | H section steel Q355, alkyd painting, two primary painting, two finish painting. |
Roof purlin | XZ160*60*20*2.5, galvanized |
Wall purlin | XZ160*60*20*2.5, galvanized |
Intensive bolt | Grade 10.9 |
Turn buckle bolt | M20+2, steel Q235, processing |
Anchor bolt | M24, steel Q235, processing |
Ordinary bolt | Galvanized bolt M20 |
Ordinary bolt | Galvanized bolt M12 |
Brace nut | Galvanized bolt M12 |
Bracing System |
|
Cross brace | 20 round steel bar Q235, process and painted (alkyd painting) |
Angle brace | L50*5 angle steel Q235, process and painted (alkyd painting) |
Column bracing | 25 round steel bar Q235, process and painted (alkyd painting) |
Tie bar | 127*3 steel pipe Q235, process and painted (alkyd painting) |
Batter brace | 32*2.5, 12 round steel bar Q235, process and painted (alkyd painting) |
Wall & Roof System |
|
Roof panel | Corrugated steel sheet or sandwich panel (EPS/fiber glass/rock wool/PU) |
Wall panel | Corrugated steel sheet or sandwich panel (EPS/fiber glass/rock wool/PU) |
Edge cover | 0.4mm color plate, angle Alu. |
Fittings & accessories | Nails, glue etc. |
Unpowered ventilator | Diameter:600, stainless steel |
Sky lighting band | 1.2mm FRP, double layer |
Sliding door | sandwich panel door |
Roof drainage system |
|
Gutter | 0.8mm color steel plate |
Rainspout pipes | 160 PVC pipe |
Materials For Steel Structure Workshop
Delivery: Usually, within 45-60 days after the order confirmed. It depends on the fabrication quantity.
Installation:
1. After production, we will supply steel building installation drawing.
2.Send techinican to guide installation on site if customer request.
Int’l Trade team: We have six internatioanl trade businessman onlines 24 hours.
Maintenance: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.
Materials For Steel Structure Workshop
Designning
We have professional and normalized design team of more than 20 engineers. Through AutoCAD, PKPM, 3D3S, Tekla Structures(X steel)and etc., we can design complex steel structure buildings, such as: warehouse, workshop, poultry house, hangar, shopping mall, 4S car shop, commercial & industrial building. Professional working team have been the basemant for us to devote ourselves to build a world wide Brand”ZBGROUP”.
Processing and Packing & Loading
Installation
Product detail pictures:
Related Product Guide:
Our merchandise are commonly identified and dependable by end users and will meet continually altering financial and social desires for North China Steel And Building Materials Company – Detailes Of Steel Structure Workshop – Zhong Bo , The product will supply to all over the world, such as: Monaco, Canada, Amsterdam, With the aim of "compete with good quality and develop with creativity" and the service principle of "take customers' demand as orientation", we will earnestly provide qualified products and solutions and good service for domestic and international customers.
By Cara from Melbourne - 2018.11.04 10:32
The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
By Jonathan from Armenia - 2018.05.13 17:00